October 12, 2016
John Howard Society – Project Update – Excavation
PBC Group excavated, line-drilled rock and removed soil in order to install weeping tile, stair footings, ramps, and the transformer pad. PBC engaged a Contractor to cut, haul and dispose of the unwanted soil and rock. The slab was poured and the foundation back-filled and waterproofed.